关于大开挖的思考

Reflections on the Big Dig
课程网址: http://videolectures.net/mitworld_salvucci_rotb/  
主讲教师: Salvucci Frederick P
开课单位: 麻省理工学院
开课时间: 信息不详。欢迎您在右侧留言补充。
课程语种: 英语
中文简介:
有时好的项目会变成坏的,有时坏的项目会变成好的。很少有人能比弗雷德·萨卢奇(Fred Salvucci)更能通过这样的判断,他是波士顿“大挖掘”项目的关键策划者。这个土木工程的庞然大物,最早出现在20世纪70年代,包括拆除一条穿过波士顿市中心的破碎拥挤的高架公路。新设计要求修建一条地下公路,以60亿美元的成本改善交通堵塞,预计竣工日期为2000年。2004年底,这项大型挖掘工程即将完工,其价格约为150亿美元。怎么了?Salvucci为规划者们讲述了一个警示故事:“政策失误”允许四年的延迟,而人们则在讨论跨越查尔斯河的桥梁的美学问题时;智能交通技术出现了,必须添加到设计中;最糟糕的是,不断膨胀的成本被推迟维护等项目所掩盖。“我们可能需要缆车,因为没有维护,(公路)可能会洪水,”Salvucci说。为了有一个更光明的结局,萨尔沃奇引用了波士顿港的清理。面对法院的命令,联邦资金的缺乏,以及Salvucci所说的“荒谬的标准”(那些通常适用于饮用水供应河流的标准),该项目设法保持在其60亿美元的预算范围内,并按时完成。Salvucci说,“我怀疑在美国是否已经实施了一个项目,因为波士顿港的清理工作已经完成。”
课程简介: Sometimes good projects go bad, and other times, a bad project turns out well. Few people can pass such judgments better than Fred Salvucci, who was a key instigator of Boston’s “Big Dig” project. This behemoth of civil engineering, first imagined in the 1970s, involved eliminating a crumbling and congested elevated highway that rammed through the heart of Boston. The new design called for an underground highway that would improve traffic gridlock, at a cost of 6 billion, with an estimated completion date of 2000. Nearing completion in late 2004, the Big Dig’s price tag is around $15 billion. What went wrong? Salvucci lays out a cautionary tale for planners: “policy blunders” permitted a four-year delay while people debated the aesthetics of a bridge crossing the Charles River; intelligent transportation technology emerged and had to be added on to the design; and worst, ballooning costs were disguised by deferring items like upkeep. “We may need gondolas because without maintenance, (the highway) may flood,” says Salvucci. For a brighter ending, Salvucci cites the Boston Harbor clean up. Faced with a court order, absence of federal funding, and with what Salvucci calls “absurd standards” (those normally applied to rivers used to supply drinking water), the project managed to stay within its $6 billion budget and finish on time. Says Salvucci, “I doubt there’s as well implemented a project in the U.S. as what was pulled off with the Boston Harbor clean up.”
关 键 词: 政策错误; 智能交通技术; 波士顿港清理
课程来源: 视频讲座网
最后编审: 2019-11-22:cwx
阅读次数: 40